You are currently viewing Inspection of key life support facilities in the capital that consume natural gas

Inspection of key life support facilities in the capital that consume natural gas

Over the weekend, the leadership of the Ministry of Energy, KazTransGas Aimak JSC and the Akimat of Astana visited key life support facilities in the capital that consume natural gas.

1 point of visit to the CHP-3. It is designed for stable heat supply to the right bank of the capital, as well as to provide heat to part of the left bank.

Also during the event, they visited CHP-2, which provides heat to the right bank of the capital and generates electricity.

Point 3 is the Turan Gas Thermal Power Plant (GTS). It was launched in December 2023. Provides heat to a promising development area along the Korgalzhinsky highway and Turan Avenue.

In 2023, the Yugo-Vostok gas thermal power plant (GTS) also started operating. It has 22 hot water boilers with a thermal capacity of 350 Gcal/hour. It provides heat to the area of the new Mynzhyldyk railway station.